Arrow Lake-H processors
5 processors codenamed Arrow Lake-H. Sockets used: BGA 2049 (5).
About Arrow Lake-H
Lion Cove and Skymont mobile processors with Arc graphics and an AI Boost NPU, launched in January 2025 at 28 W with a 45 W flagship. Socket: BGA 2049, 2025.
Processors
| Processor | Socket | Cores / threads | Base / boost | TDP | Launched |
|---|---|---|---|---|---|
| Intel Core Ultra 5 225H | BGA 2049 | 14 / 14 | 1.7 / 4.9 GHz | 28 W | Jan 2025 |
| Intel Core Ultra 5 235H | BGA 2049 | 14 / 14 | 2.4 / 5.0 GHz | 28 W | Jan 2025 |
| Intel Core Ultra 7 255H | BGA 2049 | 16 / 16 | 2.0 / 5.1 GHz | 28 W | Jan 2025 |
| Intel Core Ultra 7 265H | BGA 2049 | 16 / 16 | 2.2 / 5.3 GHz | 28 W | Jan 2025 |
| Intel Core Ultra 9 285H | BGA 2049 | 16 / 16 | 2.9 / 5.4 GHz | 45 W | Jan 2025 |